Conduct for the Updating of Feasibility Study of Agno River Flood Control Project, Phase III
The Department of Public Works and Highways thru the Project Management Office for the Flood Control and Management Office (FCMO), engaged the services of PERTCONSULT INTERNATIONAL for updating the study done by JICA, 1991 to adapt to the present natural, socio-economic and environmental condition and improvements, develop alternative flood control measures by updating the existing schemes and preliminary design of flood control works in the study area. Pertconsult is currently undertaking the Survey and Investigation (Topographic-Hydrographic and Cross – Section Surveys and Geotechnical Investigation), Hydrologic and Hydraulic Analysis, Socio-Economic Survey, Design and Cost Estimages, Benefit Analysis, Environmental and Social Analysis, Gender Consideration, Flood Inundation Analysis, River Improvement Plan, Project Evaluation, Project Implementation Schedule and preparing the NEDA-ICC PE forms of the project.